FORGOT YOUR DETAILS?

Year-round use

Light-curing epoxy resin technology

Low process costs

Modern & energy-saving LED technology

PREV
NEXT

UV renovation

Innovative, light-curing restoration methods

Light-curing

Short liner renovation

LED Kurzliner System

The new, innovative light-curing short liner system is one of the Fluvius Packer processes that have been specially developed for the partial rehabilitation of sewers and pipes in closed construction.

In a simple procedure without overlapping, individual damages such as longitudinal cracks and/or radial cracks in pipes with nominal diameters of DN 100 to DN 300 made of concrete, steel, reinforced concrete, vitrified clay, fibre cement, cast iron and PVC with a prepreg length of max. 1,500 mm can be rehabilitated quickly and to a high quality. Longer individual damages can be rehabilitated by overlapping installation.

Light-curing

Track rehabilitation

LED TRACK REHABILITATION

Here, the powerful BRAWO® Magnavity system from KOB is at your disposal.
The system enables fast, reliable and above all smart light curing.

Brawo® Magnavity

TOP
Fluvius

Fluvius